Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13684990

- Product Categories
- Friendly Links
Information Name: | On the plastic runway construction requirements |
Published: | 2015-04-02 |
Validity: | 30 |
Specifications: | |
Quantity: | 100.00 |
Price Description: | |
Detailed Product Description: | Shanxi plastic track with green and soft and comfortable features are widely used in the major stadium for the athletes to bring a lot of convenience, to introduce the following construction requirements Shanxi plastic runway. Plastic runway before construction must be on the ground to stringent checks to ensure that the ground is smooth and clean, if there is sand or gravel, then on the ground should be cleaned in advance, to ensure the construction of the ground leveled after performing. Staff should pay attention to the drainage system must be installed on the ground to ensure the smooth surface drainage, drainage systems are usually to be completely discharged to water accumulation in the rain two hours, in order to keep the plastic dry runway. So when you install the drainage system between the asphalt layer plus the best and gravel layer of geotextile buffer layer, pay attention to the site drainage trench along the foundation should do a special water treatment. Also note that the installation of plastic track in advance of the runway at the precise measurements to ensure that the plastic can be bonded with the runway thoroughly, not only to save material, but also save consumers a lot of economic costs. During installation standards should always draw the line, make sure the site can be accurately combine parts. To shorten the time interval during every barrel scraping gum glue, apply glue will not take too long to prevent reduced adhesion properties, so as to maintain a uniform speed glue, make better ground plastic runway bonding, installation out of the effect will be more solid, stable. After the adhesive is fully cured, be sure to clean the excess glue surface, ensure nice plastic runway. In summary describes the construction requirements of the plastic track, for your reference. During construction as long as strict accordance with the above requirements to carry out, will be able to ensure that the installation of the perfect plastic runway. |
Admin>>>
You are the 7348 visitor
Copyright © GuangDong ICP No. 10089450, Kam Shan Xixin radius Flooring Materials Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 7348 visitor
Copyright © GuangDong ICP No. 10089450, Kam Shan Xixin radius Flooring Materials Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility